Green Badger · LEED review
Outdoor water, worked forward.
Review twelve months of landscape demand, then reverse-solve the points your project is targeting.
Not savedlocal browser draft
01 General InformationScope & units
02 BaselineRainfall / ETo
03 Irrigation Scheduling TechnologiesControls
04 Landscape Feature InformationHydrozones
05 Alternative Water UseMonthly supply
01 General Information
Set project type, units, and desired points.
Choose and verify a suggestion to enable automatic fill.
AQUASTAT climate values are always entered in mm. Other uses inches for IP and mm for SI.
02 Baseline monthly rainfall/ETo
Enter all twelve months. Keep source detail specific enough for a reviewer.
For a contiguous U.S. project, enter the address above to fill NOAA rainfall normals and gridMET reference ETo. All values and provenance remain editable.
03 Irrigation Scheduling Technologies
The highest selected applies to all zones; technologies never stack.
04 Landscape Feature Information
Use exact landscape classifications. Up to 110 uniquely identified hydrozones.
Zone IDAreaLandscape type
05 Alternative Water Use
Monthly inputs are capped against monthly design demand. Shared-supply features are not live.
Calculate & export
Run the official engine after the five evidence steps are complete.
O20 double effective-rain display intentionally matches official. Uploaded template D178:D189 were audited as G:R monthly values, not repeated annual copies; export formulas remain untouched.